摘要
针对高坝洲电厂220kV高压开关在正常合闸过程中出现的三相不一致问题进行了分析,提出了解决办法。
The solutions for the three-phase nonuniform failure of the 220 kV switchgear of Gaobazhou Hydropower Plant occurred in switch-on process are proposed.
出处
《湖北水力发电》
2007年第5期19-21,共3页
Hubei Water Power
关键词
断控装置
操作箱
三相不一致
switch-off control device
operating box
three-phase nonuniform