摘要
介绍了大红山铜矿坚持走绿色环保的矿山发展思路,在生产组织过程中,充分利用掘进工程产生的废碴充填采空区,努力做到废石"零排放",减轻了提升系统压力,降低了生产成本,并加大对尾砂充填系统的改造力度,缓解了采充矛盾。
In Dahongshan Copper Ore Mine, the principle of "green & environment-- kindly mining" is followed- the waste rock from digging is used to fill goals for the goal of "zero discharge of waste rock". This fill technology reduces the load of lifting system, decreases the cost of operation and promotes the reform of tailings fill system thus the contradiction between mining and filling is mitigated.
出处
《矿业工程》
CAS
2007年第5期31-33,共3页
Mining Engineering
关键词
废石尾砂
充填工艺
研究
waste rock & tailings
technology of filling
research