摘要
对佑溪大桥的薄壁高墩施工所能采用的几种施工方法进行了综合比较,通过比较后选择了塔吊提升翻模施工法,并对该方法进行了详细论述,对于高墩施工具有一定的参考价值。
The paper compares several methods that could be adopted in the construction of the Youxi Bridge, turnover form construction was eventually adopted, and then the article carries on detailed treatise on the method, it has the reference cost to construct high pier.
出处
《山西建筑》
2007年第29期130-131,共2页
Shanxi Architecture
关键词
薄壁空心高墩
翻模施工
工作原理
施工工艺
thin-walled hollow pier, turnover form construction, operation principle, construction technique