摘要
结合工程概况,从顶推施工工艺流程、钢箱梁拼装平台及顶推平台搭设、滑道制作安装、钢箱梁现场拼装、钢梁顶推及落梁等方面介绍了主桥钢箱梁的顶推施工技术,以供类似工程参考借鉴。
Combined with practical work, from technological process, erection of consolidation platform and incremental launching platform, fabrication and installation of slide rail, field assembly of steel box beam and other aspects incremental launching construction technology of steel box beam is introduced in order to provide references for similar works.
出处
《山西建筑》
2007年第28期322-323,共2页
Shanxi Architecture
关键词
钢箱梁
顶推施工技术
滑道
顶推平台
steel box beam, incremental launching construction technology, slide rail, incremental launching platform