摘要
西南地区某机场高填方、场区地质条件复杂、分布有软弱土层,因而高填方体地基的稳定性问题是关键的工程技术问题。以场区西1#沟为例,在地质岩体力学环境条件分析研究的基础上使用先进的FLAC-3D数值模拟技术对高填方体地基的失稳模式进行分析,在此基础上结合二维平衡计算对高填方体的稳定性进行评价,并对地基工程处理措施提出相应的建议。
High embankment, complex geological conditions accompanied with soft soil are the main characteristics for an airport in southwest China. The stability of the high embankment foundation is a key engineering technology problem. This paper uses the advanced FLAC -3 D numerical simulation analysis technology to analyse the unstability mode of high embankment foundation on the base of analysis and research on the geology - rock mechanics conditions taking west No. 1 slope as an example. On these bases this paper adopted two - dimensional limiting equilibrium method to evaluate the stability of the high embankment. At last,the optimization suggestion on the engineering disposal measure to the site foundation is brought forward.
出处
《地下空间与工程学报》
CSCD
2007年第4期711-715,共5页
Chinese Journal of Underground Space and Engineering
关键词
机场
高填方地基
失稳模式
稳定性
airport
high embankment foundation
unstability mode
stability