摘要
广东粤华发电有限责任公司5号锅炉制粉耗电率偏高,导致发电成本上升,且不符合当今全社会开展节能降耗行动的要求。通过试验、分析,找出了原因,采取了改进措施,使制粉电耗降低。
The high power consumption rate of coal powder system of No. 5 generating unit in Guangdong Yuehua Power Company Ltd. causes high generating electricity cost, and misfits requests of reducing energy consumption in development progress. The main problems and its solu- tion in regard with economic operation of reducing power consumption rate of coal powder system in the fossil fuel power station are pointed out through many experiments.
出处
《锅炉技术》
北大核心
2007年第5期54-55,78,共3页
Boiler Technology
关键词
制粉系统
耗电率
原因
对策
coal powder system
power consumption rate
problem analysis
cduntermeasure