摘要
坝高233 m的水布垭面板堆石坝是目前已建的世界上最高的面板堆石坝,为有效解决工程中的若干技术难题,提高大坝的安全性和经济性,设计和施工中应用了很多新理念、新技术、新材料和新工艺,对此进行概括介绍,为高混凝土面板堆石坝这种坝型在设计、施工及安全监测等技术的进一步发展提供了有益的参考和借鉴。
The 233m high Shuibuya Concrete Facing Rocckfill Dam (CFRD) is the highest one of its kind ever built in the world so far. In order to solve numbers of key technical issues effectively and to improve the clam performance both in safe and economy, many new concepts, new technologies, new materials and new processes have been applied in its design, construction and safety monitoring, which are summarized in this paper to serve as a useful reference for further development in the design, construction and safety monitoring of CFRDs.
出处
《水力发电》
北大核心
2007年第8期5-9,18,共6页
Water Power