摘要
Used numerical simulation method to study the floor water-inrush mechanism in working face which was influenced by fault structure, and set up many kinds of models and performs numerical calculation by fully using large finite element soft-ANSYS and element birth-death method. The results show that the more high the underground water pressure, the more big the floor displacement and possibility of water-inrush; the floor which has fault structure is more prone to water-inrush than the floor which not has fault structure, the floor which has multi-groups cracks is more prone to water-inrush than the floor which has single-group cracks. The numerical simulation result forecasts the water-inrush in working face preferably.