摘要
在大型群体建筑工程施工中大量使用塔式起重机,群塔作业的布置对提高机械效率,满足施工生产和工期要求十分重要。本文对群塔施工的管理提出了控制措施,在昆明世纪城群塔施工管理中取得了成功,供大家借鉴参考。
Large numbers of tower crane are used in constructing large scale of building group. As to improving mechanical efficiency and filling time limit for a project, it is very important to dispose the groups of tower cranes effectively. The text brings forward a successful case of management in constructing Kunming Century City with groups of tower cranes.
出处
《建筑机械化》
2007年第9期39-42,63,共5页
Construction Mechanization