摘要
介绍深基坑工程内塔式起重机基础的设置,通过钢格柱逆作法施工的应用,将塔式起重机安装在深基坑内,并提出了施工要点和注意事项,有效地控制了塔式起重机设置施工的成本,并确保了工程的施工进度。
This article introduces the technic of building tower crane foundation in deep hole by installing steel lattice column in contrary motion. The ap- plication of this technique can control the cost in constructing with tower crane. It can also insure the construction schedule. It comes up with the key technique and matters needing attention in construction.
出处
《建筑机械化》
2007年第9期36-38,共3页
Construction Mechanization