摘要
结合工程实例,对其施工方案的确定进行了介绍,着重阐述了采用暗挖法施工的联络线多变大断面初期支护结构形成后,二次衬砌形成过程的施工方法,并对洞内各监测项目的施工监测进行了论述,从而为其他类似工程提供了参考。
Combined with practical project, it introduces the fixing of constructing plans, elaborates the constructing methods during the secondary bricking course after the formation of large cross-section digging contacting line early supporting structure, discusses constructing supervision of each supervising item in the cave, so as to offer reference for familiar project.
出处
《山西建筑》
2007年第18期124-125,共2页
Shanxi Architecture