介绍了中山市新建中承式无风撑钢箱混凝土系杆拱桥施工全过程的桥墩水平、垂直位移和拱肋应力应化及最终结果。
The horizontal, vertical displacements of piers,the variations of stresses of arch ribs and the final results of the fomer during the whole construction process of a newly built half through, concrete filled steel box tied arch bridge without wind bracing in Zhongshan city are expounded.