摘要
本文结合工程实践,通过现场试验分析研究提出锚杆桩抗拔极限荷载直接或间接的确定方法,并提出了合理的施工方案。
The direct or indirect method to determine ultimate uplift load of anchored rod pile is proposed herein based on field tests in association with engineering practice. Rational construction plan is also given.
出处
《工程勘察》
CSCD
北大核心
1997年第2期15-16,19,共3页
Geotechnical Investigation & Surveying
关键词
锚杆桩
极限荷载
抗拔
试验
ancnored rod pile
ultimate load
uplift
pull-out amount