4Thanamura.State of the art of the Japanese TBM technology-New developments[J].Tunnelling Boring Machines,2000(2):199-212. 被引量:1
5Damid Martin.TBM tunneling in poor and very poor rock conditions[J].Tunnels & Tunnelling,1998,20(3):10-15. 被引量:1
6Wolfgang Gutter.Paolo Romualdi.New design for a 10m universal double shield TBM for long railway tunnels in critical and varying rock conditions Rapid excavation tunnelling conporence,2003,1185-1196. 被引量:1
10Sebastiano Pelizza. Pilot bore excavation with TBM for the design and construction of larger tunnels [ J ]. Tunnlling and Underground Space Technology, 1991 ( 6 ) : 185 - 189. 被引量:1