摘要
文中主要介绍了张峤水库大坝监测仪器钻孔法渗压计、挖坑法渗压计、土压力计、位移式沉降仪埋设过程中需注意的一些关键工序以及对埋设方法的一些改进。同时介绍了电缆及电缆管埋设中的一些薄弱环节及加强措施。
This article mainly introduces the key working process to bury Zhangfeng Reservoir's dam monitor instruments including osmometer buried in drill hole,osmometer buried in diged pit ,earth pressure meter and settlement meter of displacement type,presents some improvement methods to install instruments,and puts forward some weak links and strengthening measures in the procedure of burying cable and cdble tube.
出处
《山西水利科技》
2007年第3期83-84,共2页
Shanxi Hydrotechnics
关键词
张峰水库大坝
监测仪器
安装经验
Zhangfeng Reservoir's dam monitor instrument installation experience