摘要
本文介绍了三门峡水电站1号水轮发电机组技术改造的内容,以及改造后的机组运行情况。从设计、制造和施工等方面的经验总结,对比分析了改造质量和效果,为类似早期建设的水轮发电机组的技术改造提供借鉴。
In this paper, the content of technological transformations of hydrogenerator unit #1 in the Sanmenxia hydroelectric power station, were introduced, In addition, some working situation after alteration were presented. To contrast with the experience of design, manufacture, construction and so on, we can analyzed the transformation quality and the effect, which would provides the model of technological transformations for the similar early hydrogenerator unit #1.
出处
《大电机技术》
北大核心
2007年第4期45-48,共4页
Large Electric Machine and Hydraulic Turbine
关键词
机组改造
成效
对比分析
对策
unit transforms
result
contrast analysis
measure