摘要
最终接头的位置和选型对沉管隧道的工期和造价有较大影响,以生物岛-大学城隧道最终接头的设计实例,介绍了沉管隧道最终接头的设计方案和施工技术措施,对今后类似工程的设计有一定的指导意义。
The positions and types of the final joints have great influence on the construction period and construction cost of immersed tunnels. Taking the design of the final joint of Shengwudao ~ Daxuecheng immersed tunnel as case history, the author presents the final design scheme and the technical construction measures for the immersed tunnel in the paper, which can provide reference for the design of similar works in the future.
出处
《隧道建设》
2007年第3期43-46,共4页
Tunnel Construction
关键词
沉管隧道
最终接头
设计
方案比选
技术措施
immersed tunnel
final joint
design
option selection
technical measure