摘要
介绍了广州市某工程大直径人工挖孔桩施工的安全管理措施和安全技术措施,以及对强透水地层采取的技术措施。该工程顺利进行,并取得良好效果。
The safety management and technique measures of a large-diameter manual excavation pile in Guangzhou were introduced in this paper.And the technique measure due to its strong pervious bed was presented.The project has succeeded and got great effects.
出处
《中国市政工程》
2007年第3期78-80,共3页
China Municipal Engineering
关键词
人工挖孔桩
安全
技术
管理
措施
manual excavation pile
safety
technology
management
measure