摘要
本文主要以武汉北编组站为例,介绍了大型编组站驼峰峰高计算方面有关参数的取值改进方法的个人见解,使驼峰峰高计算在满足设计规范的基础上更符合实际。
Taking Wuhan North Marshalling Yard as an example, the paper introduces the author's personal opinions about methods for improving the relevant parameter selection of hump height calculation for large-sized marshaling yard, which will make the hump height calculation better accord with the reality in addition of meeting the design specifications.
出处
《铁路通信信号工程技术》
2007年第3期40-42,共3页
Railway Signalling & Communication Engineering
关键词
驼峰
峰高
计算
改进
Hump, Hump height, Calculation and Improvement