摘要 通过研究和总结国内已建溢流混凝土面板堆石坝工程的建设经验,就坝身溢洪道的平面布置、坝料的选择与变形控制、溢洪道泄槽结构设计、地基排水措施与渗流控制等方面提出了在设计中应遵循的若干准则以及施工过程中应注意的事项;除此之外,对已建工程的设计和施工经验也进行了相关介绍。 By researching and summing-up the construction experiences of the overfall concrete facing roekfill dams built in China, a number of design criteria and construction requrements are put forward in general layout of embankment spillway, in selection of materials, in controlling of deformation and filtration, in structural design of the spillway-chute, in draining system of dam foundation, and so on; in addition, the experiences in the design and construction for the built projects are introduced.
作者 凤炜 唐新军
出处 《水利与建筑工程学报》 2007年第3期30-33,67,共5页 Journal of Water Resources and Architectural Engineering
基金 新疆高等学校科研计划重点项目(XJEDU2004I14) 新疆水利水电工程重点学科项目(xjzdxk-2002-10-05)
关键词 溢流混凝土面板堆石坝 设计准则 施工要求 overfall concrete facing rockfill dam design criterion construction requrement
  • 相关文献

参考文献6

  • 1唐新军,凤炜,凤家骥,庞毅.榆树沟水库枢纽工程的设计特点与运行情况[J].新疆农业大学学报,2004,27(2):52-56. 被引量:17
  • 2凤炜,唐新军,凤家骥.榆树沟溢流混凝土面板堆石坝设计与运行[C].中国混凝土面板堆石坝20年—综合·设计·施工·运行·科研.北京:中国水利水电出版社,2005:167—175. 被引量:1
  • 3姜建忠,郑齐峰,郎玲芳.桐柏抽水蓄能电站过流面板堆石坝[C].中国混凝土面板堆石坝20年—综合·设计·施工·运行·科研.北京:中国水利水电出版社,2005:160—166. 被引量:1
  • 4蒋国澄等主编..混凝土面板坝工程[M].武汉:湖北科学技术出版社,1997:370.
  • 5Li S S Y, Guidiei S, Tindall W F(Australia). Design of Crotty INto Spillway [ C ]. Proceedings International Symposium on High Earth-rockfill Dams, Volume Ⅰ, Beijing. 1993,263-271. 被引量:1
  • 6Chraibi(Morocco) A F. M'Dez Dam, A New Design of An Embankment Dam [ C ]. Proceedings International Symposium on High Earth-rockfill Dams, Volume Ⅲ, Beijing. 1993,23-30. 被引量:1