悬臂现浇法施工中竖向接缝问题分析

Analysis on the problems of vertical cracks in the construction of arm cast-in-place
下载PDF
导出
摘要 针对一些采用节段悬臂施工桥梁使用期间挠度过大的问题,分析阐述了竖向接缝对桥梁竣工后期挠度的影响,通过对竖向接缝问题三种构造处理方案的分析比较,得出中小桥型建议用竖直接缝,大桥以及超大桥建议采用斜接缝的结论。 Aiming at the problems of the too large flexibility of arm construction bridge in utility, it analyses and represents the affection of vertical cracks to the flexibility in the later phase of completion of bridge. Through analyzing and comparing the three structure management program of the problems of vertical cracks, it deduces that it is advised to use the vertical cracks of medium and small bridges and it is apt to use the oblique cracks of large and super large bridges.
作者 孙军超
出处 《山西建筑》 2007年第20期339-340,共2页 Shanxi Architecture
关键词 悬臂现浇法 竖向接缝 挠度 处理方案 arm cast-in-place, the vertical crack, flexibility, the management program