期刊文献+

地震动位移峰值对斜拉桥地震反应的影响 被引量:4

The Influence of Peak Ground Displacements on the Seismic Response of Large Span Cable-stayed Bridge
下载PDF
导出
摘要 根据同一加速度反应谱拟合了加速度峰值相同、速度峰值相同、位移峰值不同的两组地震动时程。以大跨斜拉桥的三维模型为例,在以上两组时程的激励下,应用有限元方法,对斜拉桥的地震反应进行了分析。计算结果表明:在弹性阶段,地震动位移峰值对斜拉桥的动力响应影响不明显;但当结构进入弹塑性阶段时,在位移峰值较大的一组地震动激励下,桥梁的墩底弯矩和塔顶位移会有更大的响应。 Two groups of seismic ground acceleration histories are synthesized to match the same acceleration response spectrum. Those two groups have the same peak value in acceleration and velocity, while it is different in displacement. A three-dimension large span cable-stayed bridge model is utilized to illustrate the different seismic responses of structure excited by the acceleration histories mentioned above. Applying the finite element analysis method, we find that there is barely difference in the responses of structure between the two groups of responses in the elastic stage, but in the inelastic stage the acceleration time histories which have greater displacement peak value will cause larger values of the moments at the pier bottom and the displacements at tower top than those which have less one.
出处 《中国地震》 CSCD 北大核心 2006年第4期418-424,共7页 Earthquake Research in China
基金 国家自然科学基金资助项目(项目编号:50278090)
关键词 地震动 反应谱 斜拉桥 地震反应 位移峰值 Ground motion Acceleration response spectrum Cable-stayed bridge Seismic response Peak displacement of time history
  • 相关文献

参考文献5

  • 1范立础..桥梁抗震[M],1997.
  • 2范立础, 卓卫东..桥梁延性抗震设计[M],2001.
  • 3范立础, 胡世德, 叶爱君..大跨度桥梁抗震设计[M],2001.
  • 4胡聿贤著..地震工程学[M].北京:地震出版社,1988:692.
  • 5Kent D C,Park R,1973,Cyclic Load Behavior of Reinforcing Steel,9(3),276 ~ 287. 被引量:1

同被引文献44

引证文献4

二级引证文献37

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部