摘要
上海市老新闸桥为钢桁架桥,桥长64.5 m,桥面净宽6 m,全桥共有9个节间,节间组成为8.65 m+3×6.75 m+6.7 m+3×6.75 m+8.65 m。采用整体浮运法拆除。主要介绍该桥的拆除施工设计。
The old Xinzha Bridge in Shanghai City is a steel truss bridge, 64.5 m in length and 6 m in deck net width. There are totally 9 panels on the bridge, arranged in 8.65 m+3 X 6.75 m+6.7 m+3X6.75 m+8.65 m, which are to be dismantled by the integral floating method. In this paper, the construction design of dismantling of the bridge is described.
出处
《桥梁建设》
EI
CSCD
北大核心
2007年第A01期29-31,共3页
Bridge Construction
关键词
钢桥
桁架桥
拆除
施工方案
施工方法
steel bridge
truss bridge
dismantling
construction scheme
construction method