摘要
通过对南水北调中线京石段应急供水工程漕河渡槽段落地矩形渡槽温度测试结果的分析,阐述了薄壁混凝土早期水化热温度发展的特点,提出了影响落地矩形渡槽水化热温度的主要因素与控制措施。
Based on the analysis of the temperature test result of the landing rectangle aqueduct of Caohe River for the emergency water supply project of the Beijing-Shijiazhuang Section on the Middle Route of the South-to-North Water Diversion Project, the temperature developing feature of the early-age hydration heat of the thin-wall concrete is described, and then the main effecting factors of the hydration heat temperature on the landing rectangle aqueduct and the control measures concerned are put forward herein.
出处
《水利水电技术》
CSCD
北大核心
2007年第6期47-49,52,共4页
Water Resources and Hydropower Engineering
关键词
南水北调中线工程
落地矩形渡槽
薄壁混凝土
水化热温度
Middle Route of the South-to-North Water Diversion Project
landing rectangle aqueduct
thin-wall concrete
hydration heat temperature