摘要
文章分析了张马屯铁矿的水文地质条件和矿体形态,根据矿床开采条件提出了二期扩建工程设计中应科学合理地选择首采地段。
Through analysing the geologic condition and deposit formation,scientific and reasonable selection first mining section in the process of second phase enlarging constructing design and achieving mining fill equilibrium in the process of mine production are put forward on the basis of the mining condition of Zhangmatun Iron Mine.
出处
《山东冶金》
CAS
1997年第1期5-7,共3页
Shandong Metallurgy
关键词
铁矿
水文地质条件
矿体
设计
开采条件
iron mine,geologic condition,deposit,design,mining condition