后浇带的设置与设计 被引量:3

Shallow Discussions for the Establishment and Design of the Latter Pouring Belt of Construction
下载PDF
导出
摘要 近年来,在设计和施工方面常采取有效措施,尽量增大结构伸缩缝间距或者是不设置伸缩缝,以减少工程造价及降低施工难度.在适当增大伸缩缝最大间距的各项措施中,常用的做法是设置施工后浇带.本文结合工程实例,就如何设置和设计施工后浇带进行简单的阐述. In recent years, an effective action is often taken in the design and the construction aspect ,that is to increase the joint spacing of the structure expansion as far as possible, or not to establish the expansion joint, so as to reduce the coat of project construction and also to decrease the difficulty of the construction. In the measures of increasing suitably the biggest space of the expansion joint ,the commonly used effective procedure is to establish the Latter pouring belt. An example of real project is used in this paper to illustrate how to realize the establishment and the design of Latter pouring belt.
作者 于淼
出处 《大连大学学报》 2007年第3期33-35,共3页 Journal of Dalian University
关键词 后浇带 设置 设计 latter pouring belt establishment of letter pouring belt design of letter pouring belt
  • 相关文献

参考文献5

  • 1[3]陈远椿.全国民用建筑工程设计技术措施-结构[M].北京:中国计划出版社,2003. 被引量:2
  • 2[2]李明顺,徐有邻,白生翔,等.混凝土结构设计规范[M].北京:中国建筑工业出版社出版,2002. 被引量:2
  • 3王文栋主编,殷芝霖等编著..混凝土结构构造手册 第3版[M].北京:中国建筑工业出版社,2003:758.
  • 4徐培福主编..复杂高层建筑结构设计[M].北京:中国建筑工业出版社,2005:420.
  • 5郭秉山主编..建筑结构工程师手册[M].北京:中国建筑工业出版社,2002:785.

共引文献2

同被引文献19

引证文献3

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部