期刊文献+

跨局进行线路大修清筛施工方案的探讨与实施 被引量:2

Exploration on the Construction Plan of Railway Overhaul and Ballast Screening Across More Than One Railway Administration and the Implementation
下载PDF
导出
摘要 因各铁路局的线路条件、施工配合条件及线路施工封锁慢行办法等有着较大差异,故跨局进行线路大修清筛施工中,在施工组织、施工配合、施工技术组织措施等方面与局内相比,也有着较大差异。本文主要介绍了跨局进行线路大修清筛的施工方案。 Due to the significant differences in railway conditions, construction coordination conditions, railway closure and slowing down rules related to construction among railway administrations, there are also big differences in the organization, coordination and technical organization measures when railway overhaul and ballast screening is done across several railway administrations rather than within one railway administration. The paper discusses the implementation plan of railway overhaul and ballast screening across more than one railway administration.
作者 周庆新 李伟
机构地区 济南工务机械段
出处 《铁道技术监督》 2007年第5期27-29,共3页 Railway Quality Control
关键词 跨局 大修清筛 施工方案 Overpass Bridge Construction of Swing Application
  • 相关文献

同被引文献4

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部