摘要
从长螺旋CFG桩施工工艺出发,简要论述了在成桩过程中可能会造成周围的建筑物拉裂、地面沉降等环境问题,并提出了相应的措施,以减少该工艺对周围环境的影响,保证工程质量。
This paper briefly analyzes that environmental problems such as the cracking of surrounding building,ground settlement and so on probably occur in forming piles through construction technology of long spiral CFG pile and corresponding construction measures are proposed,to decrease the affection of the technology to the surrounding circumstance and assure the projects quality.
出处
《山西建筑》
2007年第14期80-81,共2页
Shanxi Architecture
关键词
长螺旋CFG桩
环境问题
措施
long spiral CFG pile, environmental problems, measures