期刊文献+

基于神经元动态规划的可重入生产系统调度的仿真框架 被引量:2

Simulation Framework of Scheduling Re-entrant Lines Based on Neuro-Dynamic Programming
下载PDF
导出
摘要 提出一个基于神经元动态规划解决可重入生产系统调度问题的仿真框架.根据可重入生产系统的特点建立状态集,并将调度问题表示成相应的马尔可夫决策过程.选择合理的性能指标,采用神经元动态规划产生每一步的调度,并在仿真中优化策略.仿真算例验证了该方法的有效性,三种调度策略的结果比较表明了神经元动态规划方法的优越性.本仿真框架还可拓展至其他类型的生产调度问题. A simulation framework of scheduling re-entrant lines with Neuro-Dynamic Programming (NDP) is presented. The state set is constructed based on the characteristics of re-entrant lines, and the scheduling problem is described as the corresponding Markov decision process. Proper performance index is selected, and each scheduling decision is produced and improved in simulation with NDP. An example is given to illustrate the validity of the method. The comparison of three scheduling policies indicates the superiority of NDP in scheduling re-ehtrant lines. The presented simulation framework can be extended to scheduling of other kinds of production systems.
出处 《信息与控制》 CSCD 北大核心 2007年第2期218-223,共6页 Information and Control
关键词 仿真框架 可重入生产系统 神经元动态规划 调度 simulation framework re-entrant line neuro-dynamic programming scheduling
  • 相关文献

参考文献10

  • 1Kumar P R.Re-entrant lines[J].Queueing Systems,1993,13(1-3):87~110. 被引量:1
  • 2Kumar S,Kumar P R.Performance bounds for queueing networks and scheduling policies[J].IEEE Transactions on Automatic Control,1994,39(8):1600~1611. 被引量:1
  • 3赵丽娜,郑应平.可重入生产系统的一种新型优化调度策略[J].控制理论与应用,2000,17(5):730-734. 被引量:3
  • 4Choi J Y,Reveliotis S.Relative value function approximation for the capacitated re-entrant line scheduling problem[J].IEEE Transactions on Automation Science and Engineering,2005,2(3):285 ~ 299. 被引量:1
  • 5金辉宇..神经元动态规划在可重入生产系统调度的中的应用[D].中国科学院沈阳自动化研究所,2001:
  • 6柳长春..强化学习在可重入生产系统调度中的应用[D].中国科学院沈阳自动化研究所,2002:
  • 7吕文彦,党延忠.基于Petri网与遗传算法的可重入生产系统调度[J].计算机工程与应用,2005,41(19):226-228. 被引量:3
  • 8Bertsekas D P,Tsitsiklis J N.Neuro-dynamic programming:An overview[A].Proceedings of the 34th Conference on Decision and Control[C].Piscataway,NJ,USA:IEEE,1995.560~564. 被引量:1
  • 9Puterman M L.Markov Decision Processes:Discrete Stochastic Dynamic Programming[M].New York,USA:Wiley,1994. 被引量:1
  • 10Bertsekas D P,Tsitsiklis J N.Neuro-Dynamic Programming[M].Belmont,MA,USA:Athena Scientific,1996. 被引量:1

二级参考文献9

  • 1刘民,学位论文,1999年 被引量:1
  • 2Jin H,Mathematics Operations Research,1997年,22卷,2期,886页 被引量:1
  • 3Paul G,Stochastic Networks,1996年 被引量:1
  • 4P R Kumar.Re-entrant lines[J].Queuing Syst :Theory Applicat, 1993 ; 13 :87-110. 被引量:1
  • 5Peleties P,Decario R.A modeling strategy with event structures for hybrid systems[C].In :Proceedings of the 28th CDC, 1989:308-313. 被引量:1
  • 6MengChu Zhou, MuDer Jeng.Modeling, Analysis,Simulation,Scheduling,and Control of Semiconductor Manufacturing Systems:A Petri Net Approach[J].lEEE Transactions on Semiconductor Manufacturing, 1998; 11 (3) :333-357. 被引量:1
  • 7Mu Der Jeng ,Xiaolan Xie.Modeling and analysis using Petri nets for semiconductor fabrication[C].In:IEEE International Conference on Systems, Man,and Cybernetics, 1998 : 692-697. 被引量:1
  • 8Jyh-Homg Chen ,Li-Chen Fu et al.Petri-Net and GA-Based Approach to Modeling,Scheduling,and Performance Evaluation for Wafer Fabrication[J].IEEE Transactions on Robotics and Automation,2001 ; 17(5) : 619-636. 被引量:1
  • 9卫军胡,韩九强,孙国基.离散事件系统仿真技术在制造系统调度中的应用[J].系统仿真学报,2000,12(1):27-30. 被引量:25

共引文献4

同被引文献18

  • 1习小英,邹海峰,王英明,姜莉莉.单件小批量生产作业计划的倒排产算法研究[J].现代制造工程,2004(9):5-6. 被引量:7
  • 2Wang L,Keshavarzmanesh S,Feng H,et al.Assembly process planning and its future in collaborative manufacturing:a review[J].International Journal of Advanced Manufacture Technology,2009,41:132-144. 被引量:1
  • 3Deng K,Lin J,Wang F.Scheduling of re-entrant line based on swarm intelligence[C] //2008 International Symposium on Knowledge Acquisition and Modeling.Washington,DC:IEEE Computer Society,2008:323-328. 被引量:1
  • 4Jiang S,Tang L.Lagrangian relaxation algorithms for re-entrant hybrid flowshop scheduling[C] //Proceedings of the 2008 International Conference on Information Management,Innovation Management and Industrial Engineering.Washington,DC:IEEE Computer Society,2008:78-81. 被引量:1
  • 5Ingy A E,Khaled S E,Aziz E E.Modeling and simulation of re-entrant flow shop scheduling:An application in semiconductor manufacturing[C] //International Conference on Computers & Industrial Engineering.Washington,DC:IEEE Computer Society,2009:211-216. 被引量:1
  • 6Yalaoui N,Camara M,Amodeo L,et al.New heuristic for scheduling re-entrant production lines[C] //International Conference on Computers & Industrial Engineering.Washington,DC:IEEE Computer Society,2009:199-204. 被引量:1
  • 7Hu R,Wang L,Qian B,et al.Differential evolution method for stochastic flow shop scheduling with limited buffers[C] //2008 IEEE Congress on Evolutionary Computation.Washington,DC:IEEE Computer Society,2008:1295-1301. 被引量:1
  • 8Steiner G,Xue Z.On the connection between a cyclic job shop and a reentrant flow shop scheduling problem[J].Journal of Scheduling,2006,9:381-387. 被引量:1
  • 9邱文坪,史海波,尚文利.混流汽车总装配线上的零部件优化配送方案研究[J].机械设计与制造,2008(1):138-140. 被引量:4
  • 10宋晓宇,张峰,任义,曹阳.一种求解Job Shop调度问题的混合粒子群优化算法[J].沈阳建筑大学学报(自然科学版),2008,24(3):494-498. 被引量:5

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部