摘要
本文介绍了马钢300 m^2烧结机带冷余热发电工程的工艺流程,项目建设、生产实践及经济效益等情况。
The flowsheet, project engineering, its operating state and economical benefit of the generating electricity project with waste heat of straight cooler gas in MAGAMG 300m^2 sintering plant were presented in this paper.
出处
《烧结球团》
北大核心
2007年第2期8-12,共5页
Sintering and Pelletizing
关键词
带冷机
余热
发电
straight cooler, waste heat, generating electricity