城市大断面浅埋隧道中导洞法施工安全性评价——厦门国际旅游码头隧道

Evaluation for the construction safety of a city shallow tunnel of big cross-section with a central heading——Xiamen International Tourist Quay Tunnel
下载PDF
导出
摘要 厦门国际旅游码头隧道虽然全长仅110 m,但存在隧道埋深浅、围岩条件差、开挖跨度大等不利条件。隧道采用中导洞法施工,施工中进行了位移、初期支护应力、初期支护与围岩接触压力、锚杆轴力等现场监测,监测结果及分析表明:该工法安全、可靠,施工方便。文章介绍了该隧道的工程概况、施工方法、施工监测结果及分析,可供类似工程借鉴。 The 110 -m Xiamen International Tourist Quay Tunnel features shallow embedment, poor surrounding rocks and large span, etc. The tunnel was excavated by using a central heading with the monitoring for the dis- placements, stresses in the primary support, contact pressures between the primary support and rock, axial forces in anchor bolts, etc. Results of monitoring and analyses indicated that the adopted tunneling method is safe, relia- ble and convenient. The paper introduces the generals of the project, construction methods, monitoring results and their analyses, which can be referred to by similar projects.
作者 王文杰
机构地区 厦门市公路局
出处 《现代隧道技术》 EI 北大核心 2007年第2期31-34,共4页 Modern Tunnelling Technology
关键词 大断面浅埋隧道 中导洞法 施工监测 安全性 Shallow tunnel with big cross -section Central heading method Construction monitoring Safety
  • 相关文献

参考文献3

二级参考文献26

共引文献105

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部