摘要
结合工程概况,确定采用深层搅拌桩止水幕墙加喷锚支护的支护方案,介绍了其施工工艺流程,并对深层搅拌桩止水幕墙和喷锚支护的施工工艺过程进行了阐述,从而解决了施工场地狭小的难题,同时保证了工程附近建筑物的安全。
Combined with practical engineering,the author adopts the scheme of shotcrete and rock bolt support for deep mixing pile water-stop curtain wall,introduces its construction technological process,and illustrates the construction process of deep mixing pile water-stop curtain wall and shotcret and rock bolt support,in order to solve the problem of narrow construction site and to ensure the safety of the buildings surrounding the engineering.
出处
《山西建筑》
2007年第12期125-126,共2页
Shanxi Architecture
关键词
深层搅拌桩
喷锚支护
施工工艺
止水幕墙
deep mixing pile
shotcrete and rock belt support
construction technology