摘要
以厦门蓝湾国际工程为例,介绍了箱形转换层施工方案的选择、支模体系的设计、钢筋的绑扎方案以及混凝土浇筑的相关措施,以供相关工程参考。
Taking the construction for the box transfer story of the Xiamen Blue-gulf international engineering for example, this paper presents the construction scheme of the box transfer story and the design of the fonnwork system and the banding scheme of the steel and the measures of the concrete pouring.
出处
《山西建筑》
2007年第2期148-149,共2页
Shanxi Architecture
关键词
箱形转换层
支模体系
温差应力
box transfer,the formwork system, difference in temperature stress