期刊文献+

盾构出洞冻结法施工中的地下连续墙监测 被引量:1

Underground Continuous Wall Monitoring of Shield Tunneling by Artificial Ground Freezing Method
下载PDF
导出
摘要 以某超大型盾构出洞冻结法施工中的地下连续墙监测为例,介绍了盾构出洞过程中地下连续墙所受冻胀压力、顶端水平位移和相对弯曲变形的监测方法。通过现场实测数据分析,证明用实时监测方法调整冻结和洞门凿除施工可保证盾构安全顺利出洞。 Taking underground continuous wall monitoring in an outer well construction of large diameter shield by artificial ground freezing method, the monitoring methods of the frost-heave pressure on underground continuous wall, the displacement at the top and the relative distortion of underground continuous wall in the outer well construction by freezing method are introduced. It is shown that regulating the work of freezing and digging in tunnel portal by field monitoring guarantee the security of outer well construction.
出处 《中国市政工程》 2007年第1期88-90,共3页 China Municipal Engineering
关键词 冻结加固 盾构出洞 地下连续墙监测 freezing reinforcement shield tunneling underground continuous wall monitoring
  • 相关文献

参考文献3

二级参考文献8

共引文献56

同被引文献5

引证文献1

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部