摘要 天荒坪高压渗透试验旨在揭示高压岔管所在岩体在高内水压力作用下的稳定和渗透性,以论证可否建造高压钢筋混凝土岔管,并为设计提供允许水力坡降、渗水量、地应力参数及为工程措施提供依据。3只试验孔的试验结果表明,岔管区域总体上环境地应力足够高,但是,2#岔管附近存在地应力低、渗水量大的局部岩体。 High pressure permeability test in a drillhole at Tianhuangping was carried out as feasibility studies for manifolds with no steel lining. The maximum testing pressure was 10MPa. Test results show that the average initial stresses in the rock are great enough to build a manifold with no steel linig. But in some places, the stresses are not great enough and the leakage through the surrounding rock mass is rather great. So proper measures should be taken to improve the situation.
出处 《岩土工程学报》 EI CAS CSCD 北大核心 1996年第6期31-38,共8页 Chinese Journal of Geotechnical Engineering
关键词 高压渗透 钢筋混凝土岔管 抽水蓄能电站 岔管 high pressure permeability, reinforced concrete manifold.
  • 相关文献

参考文献5

同被引文献67

引证文献10

二级引证文献64

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部