温州世贸中心大厦超深大直径钻孔灌注桩施工技术 被引量:3

Quality Control for Extra-deep Large-diameter Borehole Cast-in-place Pile Construction in Wenzhou Trade Mansion
下载PDF
导出
摘要 介绍了温州世贸中心大厦120 m超深大直径钻孔灌注桩的施工技术,针对超深大直径钻孔灌注桩施工中极易引起的钻进孔斜、卡钻、垮孔、堵管等问题,提出了相应的处理措施。 Borebole east-in-place pile technology is widely used in the treatment of soft soil and rock foundations. This article is intended to illustrate the construction technology applied in the 120m extra-deep large-diameter borebole east-in-place pile of Wenzbou World Trade Center Mansion, and to present relative measures taken for the problems easily encountered during the construction, such as skewing boring, sticking, breakdown, blocking, etc.
作者 杨德才
出处 《探矿工程(岩土钻掘工程)》 2007年第1期27-29,共3页 Exploration Engineering:Rock & Soil Drilling and Tunneling
关键词 温州世贸中心大厦 钻孔灌注桩 超深孔 大直径孔 Wenzhou Trade Center Mansion east-in-place pile extra-deep borehole large-diameter borehole
  • 相关文献

参考文献1

二级参考文献2

  • 1王光远.论综合评判几种数学模型的实质及应用[J].《模糊数学》,1984,. 被引量:1
  • 2陈永平 刘云丰 汪培庄.综合评判的数学模型[J].《模糊数学》,1983,. 被引量:1

同被引文献9

引证文献3

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部