在风力发电场施工过程中,应加强主吊机械的选型,适应经常性移动和微观地形的变化;优化施工机械及工器具的配备,既提高劳动生产率又降低生产成本;优化施工程序,保证施工的连续性和机组陆续投产的需求;细化环境保护措施,确保完工后地貌、植被同期恢复等应对策略,以确保风电场施工的工期、质量,并兼顾施工的效率和成本。
During the construction of wind farms, following strategies have to be taken to guarantee the construction schedule and quality, as well as efficiency and costs: main lifting machinery selection must accommodate constant moving and terrain changes; construction machinery and tools must be optimized to improve productivity and reduce costs; construction procedures have to be optimized to insure the construction continuity and satisfy the need of units being put into production in succession; environment protection measures have to be established to insure the recovery of work site topography and vegetations.