秦皇岛热电厂300MW凝汽式机组改为供热机组可能存在问题的探讨 被引量:5

AN APPROACH TO PROBLEMS MAY EXISTING IN RETROFITTING 300 MW CONDENSING UNIT INTO HEAT-SUPPLYING UNIT IN QINHUANG DAO POWER PLANT
下载PDF
导出
摘要 探讨秦皇岛热电厂二期2×300 MW凝汽式机组改为供热机组的两种改造方案的可行性,论证结果认为:二期运行的300 MW凝汽式机组的供热改造方案不可行。为实施热电联产和集中供热,建议电厂扩建时采用定型的300 MW抽汽式机组。 The feasibility of two retrofitting schemes for retrofitting 2 × 300 MW condensing units in second - phase of project in Qin- huangdao Power Plant into heat - supplying units has been discussed. It is believed from results of evaluation that the heat - supplying retrofit scheme of 300 MW units in second - phase of operation to be unfeasible. In order to realize co - generation and central heating, it is recommended to adopt the finalized 300 MW steam extraction units.
作者 吕红缨 朱宁
出处 《热力发电》 CAS 北大核心 2007年第1期51-53,共3页 Thermal Power Generation
关键词 300 MW凝汽式机组 调节抽汽式机组 供热 300 MW unit condensing unit regulated steam extraction unit heat-supplying economic behavior safety
  • 相关文献

参考文献3

  • 1程明一等编..热力发电厂[M].北京:中国电力出版社,1998:296.
  • 2朱新华主编..电厂汽轮机[M].北京:中国电力出版社,2000:158.
  • 3国电太原第一热电厂.300MW热电联产机组技术丛书汽轮机及辅助设备[M].北京:中国电力出版社,2005. 被引量:1

同被引文献14

引证文献5

二级引证文献33

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部