摘要
探讨秦皇岛热电厂二期2×300 MW凝汽式机组改为供热机组的两种改造方案的可行性,论证结果认为:二期运行的300 MW凝汽式机组的供热改造方案不可行。为实施热电联产和集中供热,建议电厂扩建时采用定型的300 MW抽汽式机组。
The feasibility of two retrofitting schemes for retrofitting 2 × 300 MW condensing units in second - phase of project in Qin- huangdao Power Plant into heat - supplying units has been discussed. It is believed from results of evaluation that the heat - supplying retrofit scheme of 300 MW units in second - phase of operation to be unfeasible. In order to realize co - generation and central heating, it is recommended to adopt the finalized 300 MW steam extraction units.
出处
《热力发电》
CAS
北大核心
2007年第1期51-53,共3页
Thermal Power Generation
关键词
300
MW凝汽式机组
调节抽汽式机组
供热
300 MW unit
condensing unit
regulated steam extraction unit
heat-supplying
economic behavior