摘要
该文介绍了在杭嘉湖北排中苏州段5座桥梁桥台接坡处采用粉喷桩处理软土地基时的施工要求、质量控制及质量检测。
The article introduces the construction requirement, quality control and quality measuring when the powder-spray pile is used to treat the soft soil subgrade at the abutment slope junctions of five bridges in Sozhou section of Hubei Paizhong in Hujia Expressway.
出处
《城市道桥与防洪》
2007年第1期79-80,共2页
Urban Roads Bridges & Flood Control
关键词
粉喷桩
施工要求
质量控制
检测
powder-spray pile, construction requirement, quality control, measuring