某管道悬索跨越于2003年设计完成,2004年下半年完成施工。但是在运行过程中,发现了一些问题,其中桥面结构扭曲和风索主索端部锚具件角度偏差较为典型,经过认真测量、校核和计算,提出了相应的整改措施。
The suspension crossover cable system for a pipeline was designed in 2003, whose construction was finished in 2004. Some problems occurred in its operation. The deck structure was twisted and the anchorages at the main cable end of the wind cable were inclined, which were the typical ones. The conclusion is obtained after carefully checking and calculating the design of the system;the relevant countermeasures are also proposed.