期刊文献+

Summarizing the Methods of Determination of Rational Completion Status of Cable-Stayed Bridges 被引量:2

Summarizing the Methods of Determination of Rational Completion Status of Cable-Stayed Bridges
下载PDF
导出
摘要 Cable-stayed bridge is a high-order hyperstatic structure. The size of cable force affects the stress of the structure greatly. The key problem to determine the rational completion status of cable-stayed bridges is how to control cable force on completion status. Surrounding this problem, domestic and foreign experts and scholars have done a lot of favorable work and obtained much achievement. On the basis of comprehensive reading domestic and foreign relative documentation, the author of this article classifies rationally the current researching achievement, comments and compares advantages and disadvantages of each method and lists two synthetic methods’ detail steps and puts forward the researching emphasis of the field will deflect to synthesis several methods to determine the rational completion status of cable-stayed bridges. Cable-stayed bridge is a high-order hyperstatic structure. The size of cable force affects the stress of the structure greatly. The key problem to detemine the rational completion status of cable-stayed bridges is how to control cable force on completion status. Surrounding this problem, domestic and foreign experts and scholars have done a lot of favorable work and obtained much achievement. On the basis of comprehensive reading domestic and foreign relative documentation, the author of this article classifies rationally the current researching achievement, comments and compares advantages and disadvantages of each method and lists two synthetic methods' detail steps and puts forward the researching emphasis of the field will deflect to synthesis several methods to determine the rational completion status of cable-stayed bridges
出处 《工程科学(英文版)》 2006年第4期64-72,共9页 Engineering Sciences
关键词 悬索桥 桥梁 应力平衡 静定 cable-stayed bridge rational completion status cable force
  • 相关文献

参考文献10

  • 1Lu Qiu,Xu Youguang.Discussing the optimal cable force of cable-stayed bridges[].Highway Transaction of China.1990 被引量:1
  • 2H Adeli,Zhang Fully.Nonlinear analysis of composite girder cable-stayed bridges[].Computers and Structures.1995 被引量:1
  • 3Xiao Yucheng,Xiang Haifan.Optimumof cable force of cable-stayed bridge and its engineering application[].Computational Mechanics Transaction.1995 被引量:1
  • 4Zhan Jianhui,etc.Using Synthetic Method to determine Rational Completion Status of Cable-Stayed Bridges[].Highway Association of ChinaBridge and Structure Dngineering Association Memoir.2002 被引量:1
  • 5Guo Wenfu.Optimal Adjusting Cable of Cable-Stayed Bridge[].The Memoir of International Academic Seminar of Cable-Stayed Bridge.1995 被引量:1
  • 6Walter Podolny,John B Scalzi.Construction and design of cable-stayed bridges[]..1986 被引量:1
  • 7Yan Donghuang,Li Xuewen,Liu Guangdong,Yi Weijian.Determingthe rational completion status of main beam of cable-stayed bridge by stress balance[].Highway Transaction of China.2000 被引量:1
  • 8Xiao Yucheng,Xiang Haifan.The influence matrix method of optimumcable force[].Tongji University Transaction.1998 被引量:1
  • 9Cheng Mingxian.Cable-Stayed Bridge Construction Techonlogy[]..2003 被引量:1
  • 10P.K.A.Yiu,,D.M.Brotton.Computation of fabrication dimensionfor cable-stayed bridges[].Structural Engineer.1985 被引量:1

同被引文献8

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部