摘要
运用中长期发电计算方法及统计数据,详细说明了三峡工程围堰发电期防洪、航运及发电效益,着重分析了超发电效益的组成,并由此得出下一步增加发电效益的措施。
The benefit of flood control, navigation and power generation of the Three Gorges Project during its cofferdam power generation period are expounded by means of the medium and long-term power generation calculating method and statistic data. The composition of additional power generation benefit is emphasized, and the measures for more power generation benefit are proposed.
出处
《水电自动化与大坝监测》
2006年第6期1-3,共3页
HYDROPOWER AUTOMATION AND DAM MONITORING
关键词
三峡工程
围堰发电期
效益
Three Gorges Project
cofferdam power generation period
benefit