摘要
双曲线自然通风冷却塔作为火电厂重要的标志性构筑物之一,筒体的渗漏,影响冷却塔使用寿命与外观工艺质量,影响电厂的总体形象,且可能威胁到结构的永久性和安全性,一直是施工质量的重要通病。本文结合鸭溪电厂4×300MW机组新建工程冷却塔施工,对筒体的渗漏的原因以及控制措施进行探讨。
The water cooling tower is one of the important structure which is for the power plant area, permeability of the shell is the very important factor which influenced tower's nature life,technics's quality and total vsualization for the power plant. If this factor is not well the cooling tower is not safe for along time. Construction company can not deal wih this problem very weU.This new problem is combine with the cooling tower's construction of the YAXI project (4×300MW) and discuss the reason that cooling tower permeability and disposition of the construction.
出处
《福建建材》
2006年第4期96-97,共2页
Fujian Building Materials
关键词
冷却塔
筒体的渗漏原因
控制措施
the water cooling tower
the reason for the Permiability of the shell
disposition of the construction