摘要
结合深圳龙岗区文化体育中心影剧院的场区土层概况,分析了场地下存在的问题,并比较了几种解决方案,介绍了LC桩处理地基的工作原理及特点,总结了LC桩在本工程中的技术要求和措施,为类似工程提供参考。
Combined with the earth situation of culture and PE centre' s theatre in Longgang district, Shenzhen city, analyses the problems existed in court, compares several plans of solving, introduces the working principle and feature of processing ground base by LC Pile, summarizes the skill requirements and measures of LC Pile in this project, supplies references for similar projects.
出处
《山西建筑》
2006年第24期84-85,共2页
Shanxi Architecture
关键词
低强度混凝土桩(LC桩)
地基处理
复合地基
承载力
low-intensity concrete pole (LC Pile), ground base-processing, compound ground base, bearing capacity