期刊文献+

李师关隧道洞口滑坡发生机理与防治措施研究 被引量:9

Study on the Landslide Mechanism and Treatments at the Portal of Lishiguan Tunnel
下载PDF
导出
摘要 李师关隧道是十漫高速公路的一座小净距隧道,在建设过程中该隧道洞口先后两次滑坡。文章探讨了滑坡的过程及其处理情况;重点分析了两次滑坡,特别是第二次滑坡产生的原因;采用弹塑性有限元和强度折减法以及ANSYS软件进行了计算;得到了一些规律性的结论。分析结果说明隧道洞口刷坡坡率不宜过大,以尽量减小对山体的扰动;应遵循施工工艺,保证施工质量;如发生危险情况,应及时采取加固措施以避免险情扩大。 Lishiguan Tunnel is a tunnel of Shiman ( Shiyan - Manchuanguan ) Expressway with small interval. In the tunnel construction there were two landslides occurred. The progress and treatment of the landslide have been analyzed in this paper. The masons of the landslide, especially for the second landslide, are studied. The elasto - plastic finite element analysis, strength reduction method and ANSYS software are used for the calculation. Some conclusions have been obtained. The analytical results show that the cutting slope at the tunnel mouth should not be too large, so that the mountain body may not be disturbed. Also, the'construction technique should be followed and the quality should be guaranteed. If the dangerous eases took place, the consolidated methods should be taken and the dangerous situation may not be enlarged.
出处 《地下空间与工程学报》 CSCD 2006年第B08期1445-1450,共6页 Chinese Journal of Underground Space and Engineering
关键词 滑坡 两郧断裂带 强度折减法 隧道 landslide Liangyun fracture band strength reduction method tunnel
  • 相关文献

参考文献4

二级参考文献8

共引文献765

同被引文献70

引证文献9

二级引证文献46

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部