北仑电厂循环水泵房基坑监测分析 被引量:11

Monitoring and analysis of excavation in circulation water pump-station of Beilun Power Plant
下载PDF
导出
摘要 介绍北仑电厂循环水泵房基坑采用逆作法施工的现场监测实例。对基坑开挖过程中地下连续墙体变形、钢筋应力、土压力及沉降进行实时监测。从分析结果来看,围护结构的变形控制在允许范围内,且对周边环境影响较小,说明本工程采用逆作法施工相当成功,达到了预期的效果。 The excavation in circulation water pump-station of Beilun Power Plant, by use of top-down construction method, was proposed. The deformation of diaphragm walls, steel stresses, soil pressures and settlements were monitored, and the monitoring data during the construction were analyzed. The analysis of the monitoring results show that the deformation of excavation is controlled within the allowable range and the construction of excavation has small effect on surroundring environment. Finally, the project by use of top-down excavation is successful and the expected engineering effect is acquired.
出处 《岩土工程学报》 EI CAS CSCD 北大核心 2006年第B11期1802-1805,共4页 Chinese Journal of Geotechnical Engineering
关键词 基坑 地下连续墙 监测 excavation diaphragm wall monitoring
  • 相关文献

参考文献5

二级参考文献5

  • 1匿名著者,1995年 被引量:1
  • 2陈希哲,地基事故与预防,1994年 被引量:1
  • 3团体著者,岩土工程手册,1994年 被引量:1
  • 4《基坑工程手册》编辑委员会[编],刘建航,侯学渊.基坑工程手册[M]中国建筑工业出版社,1997. 被引量:1
  • 5《基坑工程手册》编辑委员会[编],刘建航,侯学渊.基坑工程手册[M]中国建筑工业出版社,1997. 被引量:1

共引文献61

同被引文献68

引证文献11

二级引证文献77

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部