摘要
简要介绍南京地铁南北线一期工程新街口车站的结构设计概况,阐述盖挖逆作设计中所采用的新工艺和新技术,并指出今后设计方面需要改进的地方。
The structural design of Xinjiekou Station of Nanjing Subway phase I project is briefly introduced including some new techniques adopted in the design of the station, which is constructed by covered top - down excavation. Some improvements that need to be carried out in later designs have also been pointed out.
出处
《都市快轨交通》
2006年第5期71-74,共4页
Urban Rapid Rail Transit
关键词
南京地铁
车站
盖挖法逆作法
地下连接墙
预制桩接头
钢管柱
Nanjing subway
station
covered excavation
top- down method
underground diaphragm wall
joint of precast piles
steel pipe column