摘要
文章应用工程实例,阐述拆除基地因后期施工需要,拔除原有短桩桩基的施工要点及施工工艺。
This article describes the construction essential and technology of former pile pulling due to anaphase construction need through actual engineering case.
出处
《住宅科技》
2006年第10期57-59,共3页
Housing Science
关键词
基础
拔桩
施工
工艺
foundation
pile pulling
construction
technology