摘要
由于在网络图中的非关键工作都有时差,所以这些工作在开工时间上都有一定的弹性,利用好非关键工作的弹性范围在某种程度上是进行网络图优化的关键,合理的网络优化可以带来良好的经济效益。本文主要从工期固定,成本最低,资源消耗最少的角度去研究如何进行比较经济的施工。
Because the non - key path of network diagram exists float, these works all have certain flexibility in starting work time. Making use of the flexible scope of the non - key work in a way is the key of carrying on the network diagram excellent turn and the reasonable excellent turn network can bring favourable economic performance. From the fixed work period, the lowest cost and the minimal resources consumes, this parer researches on how carrying on compare tconomy of constraction.
出处
《中州大学学报》
2006年第4期110-112,共3页
Journal of Zhongzhou University