本文通过广州芳村-花地工程软土地基的处理实例,对堆载预压法和强夯加固法在广州软土地基处理工程中的应用进行分析对比,评析了两种方法取得的效果以及各自的优缺点,这对于同类型地基处理工程具有重要借鉴意义。
From the soft clay foundation treatment in Fangcun-Huadi project in Guangzhou, the preloading method and dynamic consolidation methoct (DCM) which used in ,soft clay foundation processing have been analyzed and compared, and the paper also estimated the effects of these two methods,pointed out their merit and disadvantage in local soft clay foundation project, these can provide much reference for the same kind of foundation treatment project.
出处
《广东输电与变电技术》
2006年第3期36-38,共3页
Guangdong Power Transmission Technology
关键词
地基处理
堆载预压
强夯加固法
软土
Ground treatment Preloading, Dynamic consolidation method,Soft clay